Case Study
Ark M&E, the appointed building services contractor for Barking Wharf, required a fully certified smoke ventilation package capable of meeting EN 12101-8 standards under tight programme constraints.
The development’s multi-storey residential blocks demanded a reliable, high-performance mechanical system to manage smoke and heat, while minimising disruption to the construction schedule. Sertus was engaged to design, manufacture, and supply the critical smoke ventilation products needed to meet these technical, safety, and delivery requirements.
Sertus’ reliable products ensured our smoke ventilation system was both compliant and efficient, streamlining our installation process and meeting our tight deadlines.
A modular, pre-fabricated, and pre-commissioned mechanical extract Pod™ certified to BS EN 12101-3:2015. Delivered as a single-lift unit to reduce on-site labour and installation time, providing guaranteed extract rates and optional environmental ventilation.
Certified to BS EN 12101-8:2011, Class EIS 120 fire resistance. Installed across multiple storeys to provide precise smoke ventilation and enable simultaneous environmental ventilation through the same housing.
Installed at roof level for rapid smoke and heat exhaust. Certified to BS EN 12101-2 and EN 13501-1, offering high thermal performance, weather resistance, and optional glazing or insulated solid lid configurations.
Together, these Sertus-supplied products provided a robust, compliant, and efficient smoke ventilation system that optimised installation speed, minimised on-site work, and ensured long-term reliability for Barking Wharf’s residents.
All products certified to BS EN 12101-2, BS EN 12101-3, and BS EN 12101-8 standards, ensuring life-safety performance.
Pre-fabricated and pre-commissioned Pod™ and damper units minimised site time and reduced crane lifts.
Single leaf vents and dampers provided both smoke and environmental ventilation, enhancing comfort and air quality.
Modular housings combined multiple functions into single units, streamlining installation and coordination.
All components designed for long-term operation and tested for 10,000+ cycles under fire and environmental conditions.
All Sertus products manufactured, tested, and delivered on schedule to support Ark M&E’s project deadlines.